Electrical Installations

Specialized electrical installations for data centers

SUPPORT

Detailed description

We plan and implement resilient electrical installations for server rooms, emphasizing redundancy, grounding and safety.

What does this service include?

  • Load assessment, electrical distribution and backup or protection needs.
  • Implementation of dedicated circuits, panels, protections and grounding.
  • Functional testing, safety recommendations and solution documentation.

Estimated timeline

Between 1 and 6 weeks, depending on complexity, applicable standards and required physical adaptations.

Relevant information

  • Ideal for technical rooms, servers, sensitive equipment and areas requiring operational continuity.
  • Can be complemented with UPS, monitoring, thermal control and rack reorganization.
  • It is recommended to validate local regulations and availability of work windows.

Frequently asked questions

  • Is this service only for data centers?

    Not exclusively. It also applies to technical rooms, offices with critical equipment and areas requiring stable and safe power.

  • Can you redesign an existing installation?

    Yes. We can evaluate the current installation, identify risks and propose progressive improvement or complete reconfiguration.

  • Do you include electrical protection and grounding?

    Yes. These are key components of this type of project and are evaluated from the initial phase.

  • How long does a typical adaptation take?

    It depends on site and scope, but a point intervention can be resolved in days and comprehensive adaptation in several weeks.

  • Can it be executed without completely stopping operations?

    In many cases yes, as long as controlled windows, temporary redundancies and security protocols are planned.